Monumental restoration of the building of connected Pavilions No. 8 and No. 9 at UVMP in Košice
Basic information
Slovak title:
Pamiatková obnova budovy spojených Pavilónov č. 8 a č. 9 na UVLF v Košiciach
Registration No.:
02I02-29-V01/029
Source:
Recovery and Resilience Plan of the Slovak Republic
Implementation time:
2024 - 2025
Principal (UVMP):
Schréter Róbert, Ing., PhD. (2024: 50.000% | 2025: 050.00%)
Principal workplace:
Bursar's Office
Principal workplace:
Bursar's Office
Contributors:
Takáčová Tatiana, Ing. (2024: 25.000% | 2025: 25.000%)
Sitániová Mária, JUDr. (2024: 25.000% | 2025: 25.000%)
Field of study:
999 - Without specifying a scientific field
Financial indicators
NON-CAPITAL FUNDING in €
CAPITAL FUNDING in €
Allocated
Spent
Allocated
Spent
Allocated / Spent
Allocated / Spent
2024
0
0
1288656.960
0
0 / 0
1288656.960 / 0
2025
0
0
0
0
0 / 0
0 / 0
Spolu
0
0
1288656.96
0
0 / 0
1288656.96 / 0
Anotation
Projekt je zameraný na zlepšenie energetickej hospodárnosti pamiatkovo chránenej budovy, ktorá je národnou kultúrnou pamiatkou zapísanou v Registri nehnuteľných národných kultúrnych pamiatok, a ktorou sa dosiahne stredná hĺbková obnova budovy. Cieľom obnovy budovy je realizovanými opatreniami dosiahnuť úsporu globálneho ukazovateľa primárnej energie minimálne na úrovni 30 %. Splnenie požiadavky úspory primárnej energie bude preukázané porovnaním hodnoty existujúceho stavu Projektovým energetickým hodnotením existujúceho stavu budovy a dosiahnutými navrhovanými ukazovateľmi nového stavu budovy po realizácii opatrení preukázanými Energetickým certifikátom. V rámci realizovaných aktivít pôjde o stavebno - technickú obnovu budov a obnovu technických systémov.
The project is aimed at improving the energy efficiency of the listed building, which is a national cultural monument registered in the Register of Immovable National Cultural Monuments, and which will achieve a medium depth renovation of the building. The aim of the renovation of the building is to achieve savings in the global primary energy indicator of at least 30% through the implemented measures. The fulfilment of the primary energy saving requirement will be demonstrated by comparing the value of the existing state by the Project Energy Assessment of the existing state of the building and the achieved proposed indicators of the new state of the building after the implementation of measures proven by the Energy Certificate. The implemented activities will include the construction and technical renovation of buildings and the renewal of technical systems.
Publication outputs